New projects in Greater Noida since 2024: 29 registered, and where Eldeco 7 Peaks sits.
This page is our desk's register-sourced list of new projects in Greater Noida: 29 project registrations that carry a Greater Noida register address and a UP-RERA registration filed since 2024, drawn from a register mirror read on 29 July 2026, sorted by sector with each project's promoter and declared completion date, and showing where Eldeco 7 Peaks Residences itself, registered 28 January 2026 at Sector Omicron 1A, sits in the same corridor and era. A search for "new project in Greater Noida" or "pre launch projects Greater Noida" wants a list with names on it, not an adjective. This is that list, built from the authority's own register rather than from any developer's marketing copy, current to the dates stamped below.
Greater Noida new-project cohort, 2024 to 2026, at a glance
- Cohort size
- 29 project registrations with a Greater Noida register address
- Registration window
- 22 February 2024 to 8 July 2026 (10 registered in 2024, 13 in 2025, 6 in 2026)
- Sector or block labels
- 19 distinct labels as filed; Sector 12 carries the most, with 4
- Eldeco 7 Peaks Residences
- UPRERAPRJ106523/01/2026, registered 28-01-2026, Sector Omicron 1A (not itself a row in this cohort extract)
- Register mirror read
- 29 July 2026
- Verify
- Uttar Pradesh Real Estate Regulatory Authority, at up-rera.in
Every field on this card and in the table below was read from a copy of the UP-RERA register mirror dated 29 July 2026.
PUBLISHED & UPDATED 10 SEP 2026 · REGISTER MIRROR READ 29 JUL 2026 · SOURCE: UP-RERA (UP-RERA.IN)
Twenty-nine new projects registered in Greater Noida since 2024
Twenty-nine. Twenty-nine project registrations carry a Greater Noida register address and a registration date between 2024 and 2026, in the copy of the UP-RERA register mirror this desk read on 29 July 2026. Every one of the 29 is set out below: the project name as registered, the sector or address fragment as filed, the promoter as registered, the registration date, the declared completion date, and the registration type the authority marks against it. The table is sorted by sector, so two things are visible at once: who is building where, and how many names sit in the same pocket of ground.
This is a count of registrations, not of launches, sales offices or advertised units. A project can be registered and still be months from its first price list, and a project can be registered and already selling; the register tells you only that it exists on record, with the fields below attached to it. Read those fields, not a hoarding, before you treat any of the 29 as open for booking.
| Project (as registered) | Sector / address (as filed) | Promoter (as registered) | Registered | Declared completion | Type |
|---|---|---|---|---|---|
| LEGACY BY GAURS | Jaypee Greens (no sector number filed) | GOLF HORIZON LLP | 28-10-2024 | 28-09-2029 | New |
| BIIGTECH | Knowledge Park-III | PRASANDI INFOTECH PARK PRIVATE LIMITED | 26-08-2025 | 30-06-2030 | New |
| Irish Platinum | Sector 10 | IRISH BUILDCON PRIVATE LIMITED | 02-03-2024 | 31-01-2029 | New |
| NIRALA DIADEM | Sector 10 | PARTH BUILTECH PRIVATE LIMITED | 17-11-2025 | 12-10-2030 | New |
| ACE HANEI | Sector 12 | LA BUILDTECH PRIVATE LIMITED | 11-10-2024 | 30-10-2028 | New |
| Ashtech Presidential Towers | Sector 12 | ASHTECH INDUSTRIES PRIVATE LIMITED | 10-10-2025 | 09-09-2030 | New |
| Eldeco La Vida Bella | Sector 12 | ELDECO REAL ESTATE LIMITED | 26-04-2024 | 16-01-2029 | New |
| VVIP ADDRESSES GREATER NOIDA (WEST) | Sector 12 | VIBHOR VAIBHAV INFRAHOME PVT. LTD. | 27-11-2024 | 18-09-2029 | New |
| Palm Olympia PH 3 | Sector 16C, Greater Noida (West) as filed | SAM INDIA ABHIMANYU HOUSING | 14-09-2024 | 30-04-2028 | New |
| Eros Sampoornam 3 | Sector 2 | AJAY ENTERPRISES PRIVATE LIMITED | 26-07-2024 | 31-12-2028 | New |
| The Peridona C-1 Jaypee Greens | Sector 26 and 31 (Jaypee Greens) | CRC GREENS PRIVATE LIMITED | 16-05-2025 | 04-02-2030 | New |
| Sobha Aurum | Sector 36 | SOBHA LIMITED | 17-06-2025 | 30-04-2030 | New |
| Nilay Square | Sector Alpha-II | NILAY INFRATECH PRIVATE LIMITED | 25-03-2025 | 15-01-2030 | New |
| KB Central | Sector CHI-PHI Extn. | AVORA BUILDERS PRIVATE LIMITED | 23-05-2026 | 31-03-2031 | New |
| Delta Square 1 | Sector Delta-1 | BABAGREEN INFRABUILD PRIVATE LIMITED | 20-03-2026 | 09-01-2031 | New |
| Kaveri City Centre-2 | Sector Delta-1 | KAVERI ELITE INFRA DEVELOPERS PRIVATE LIMITED | 20-03-2026 | 07-01-2031 | New |
| LEVANTE METRO WALK | Sector Delta-1 | LEVANTE PROJECTS | 18-02-2026 | 30-12-2030 | New |
| Delta Square | Sector Delta-2 | BABA PROJECTS PRIVATE LIMITED | 22-12-2025 | 15-10-2030 | New |
| Lifestyle Central | Sector Delta-2 | DTR DEVELOPERS LLP | 08-07-2026 | 08-04-2031 | New |
| MIGSUN DELTA STREET | Sector Delta-2 | MAHALUXMI INFRAHOME PVT LTD | 29-01-2025 | 10-09-2029 | New |
| KB West Walk | Sector Ecotech-12 | SHREE KUNJ BIHARIJI REALTY PRIVATE LIMITED | 07-01-2026 | 28-10-2030 | New |
| SKA ESTATE | Sector Eta-2 | PRASU HOME LLP | 07-03-2025 | 23-01-2030 | New |
| GROUP HOUSING CGEWHO PHASE II | Sector P-4 (Builders Area) | CENTRAL GOVERNMENT EMPLOYEES WELFARE HOUSING ORGAN | 22-02-2024 | 02-10-2027 | New |
| JP Parks | Sector PI-1 | GANADHI PATI CONSTRUCTION PRIVATE LIMITED | 30-06-2025 | 19-07-2029 | New |
| PI City Center | Sector PI-1 | GOVINDA HOUSING LIMITED | 21-03-2025 | 19-01-2030 | New |
| SHAGUN CITY CENTER | Sector PI-1 | SHAGUN MART LLP | 10-07-2024 | 11-04-2029 | New |
| Godrej Arden | Sector Sigma III | GODREJ PROPERTIES LIMITED | 13-08-2025 | 15-05-2030 | New |
| SKA DESTINY ONE | Sector Zeta-I | PRASU DEVELOPERS LLP | 08-04-2024 | 20-01-2029 | New |
| NXONE - ARK | Tech Zone IV, Greater Noida (West) as filed | S.P.SAI.IT.PVT. LTD | 17-02-2025 | 27-10-2029 | New |
All 29 rows reproduced from the UP-RERA register mirror this desk read on 29 July 2026. Project names and promoters carry the authority's own spelling; the Sector / address column is normalised from the filed address string (for example, "GH-01A, Sec-ETA-2" is printed "Sector Eta-2"). The live record at up-rera.in always prevails over this copy.
The sectors these 29 registrations sit in
These 29 registrations sit under 19 distinct sector or block labels on the register, as filed, ranging from a single project in sectors such as Sigma III, Eta-2, Zeta-I, Alpha-II, Ecotech-12 and Sector 2, up to four in Sector 12: Ashtech Presidential Towers, Eldeco La Vida Bella, ACE HANEI and VVIP Addresses Greater Noida (West). Three sector groups follow with three apiece: the Delta-2 group (Delta Square, Lifestyle Central and MIGSUN Delta Street), the Delta-1 group (Delta Square 1, Kaveri City Centre-2 and Levante Metro Walk), and Sector PI-1 (JP Parks, PI City Center and Shagun City Center). Sector 10 carries two (Irish Platinum and Nirala Diadem). The remaining fourteen sector labels in the table above carry one project each.
Two of the 29 rows carry "(West)" inside their own filed address rather than inside a sector number: NXONE - ARK, at Tech Zone IV, and Palm Olympia PH 3, at Sector 16C. We keep the West notation for both, the same way the sector column is normalised from the filed address rather than reproduced letter for letter (see the note under the table). A third row runs the other way: VVIP Addresses Greater Noida (West) carries "(West)" in its own project name, but its filed address on the copy we read states plainly "Sector 12, Greater Noida", with no West notation at all. Name and address disagree on that copy; the project name above is printed as filed and the sector text is normalised, and the reconciling is left to the reader, not to us.
One row, LEGACY BY GAURS, files an address inside the Jaypee Greens township with no separate sector number attached to it. We print "Jaypee Greens (no sector number filed)" rather than inventing one. Where a field is genuinely absent on the register, saying so plainly is more useful than a guess dressed up as a fact.
Pre-launch and newly launched projects, by registration date
Going only by registration date, and by nothing a brochure or a sales call says: six of the 29 were registered in 2026 itself, all before this desk's 29 July 2026 read of the register: KB West Walk (7 January 2026), Levante Metro Walk (18 February 2026), Delta Square 1 and Kaveri City Centre-2 (both 20 March 2026), KB Central (23 May 2026) and Lifestyle Central (8 July 2026). Those six carry the most recent registration dates in this cohort, which is the only sense in which the register itself lets you call anything "new" or "newly launched".
The other 23 split as 10 registered in 2024 and 13 registered in 2025. A registration date two years old does not by itself mean a project is finished or half sold; it only means the clock the register runs (proposed start, construction period in months, declared completion) has been running for longer. If what you actually want to know is when a project is due, read its declared completion field, not its registration date, and treat a declared date as filed, never as a promise you can subtract months from.
What "pre-launch" means on the register
Nothing. "Pre-launch" is not a field the UP-RERA register carries, for these 29 projects or for any other. What the register does carry, for every row in this cohort, is a project type marked "New", a registration date, a proposed construction period in months, and a declared completion date. Those four fields tell you when a project entered the register and when its promoter has told the authority it will be finished. None of them tells you whether a tower has opened for booking, whether a price list exists yet, or whether a sales office is open this Saturday.
"Pre-launch", "soft launch" and "newly launched" are words from the sales floor, not from the statute. They describe the weeks around a project's first public price list, which can arrive the same month as registration or many months after it, and the register has no field that records that moment for any of the 29 above. If a listing or a call tells you a project is "pre-launch", the useful next question is not whether that is true but what it rests on, because the register will not answer it for you. Ask for the current price list and its date, in writing, and treat the registration date in the table above as the one fact on this page you can check yourself at up-rera.in without asking anyone.
Where Eldeco 7 Peaks sits in this list
Not as a row in the table above, and it is worth saying plainly why. Eldeco 7 Peaks Residences, registered 28 January 2026 under UPRERAPRJ106523/01/2026 to promoter Eldeco Homes Developers Limited, at Plot GH-01 and GH-01A, Block A, Sector Omicron 1A, with declared completion 14 November 2030, is a Greater Noida registration from the same era as the 29 above. But it does not appear as a row in this particular cohort extract of the register mirror, and the reason sits in that address text: the filed register address reads "Sector Omicron 1A" without the words "Greater Noida," while every one of the 29 filed addresses in the table above carries those two words. We would rather say that plainly, as what the address text itself shows, than quietly fold 7 Peaks into a table it is not actually a row of.
What this cohort does carry, from the Eldeco name, is one project: Eldeco La Vida Bella, registered 26 April 2024 under UPRERAPRJ136219/04/2024, promoter Eldeco Real Estate Limited, at Sector 12 (its filed address reads "GH-02 C, sector 12, Greater Noida", the string the cohort filter matched), declared completion 16 January 2029. That is a separate registration, under a separate promoter entity, at a separate sector, for a separate Eldeco project. This desk sets out the Eldeco registrations on file for Gautam Buddha Nagar, including 7 Peaks and five more (Echoes of Eden, La Vida Bella, Ballads of Bliss, Whispers of Wonder and Aamantran), on a page of its own.
The practical takeaway for a Greater Noida search that turns up Eldeco 7 Peaks: check its registration number directly, the same way you would check any of the 29 above, at up-rera.in or on this project's own RERA page, rather than assuming it sits inside any one corridor cohort just because the developer's name is familiar from elsewhere in the sector.
How to pick between them
Not by asking which of the 29 is "best", because that is not a question the register can answer, and this page will not pretend otherwise. What the register, the price sheet and the filed documents together let you check is the same five things, regardless of which name on the list you start with:
- Registration and declared completion as fields, not promises. Read the registration number and the declared completion date on up-rera.in yourself, the way this page reads them for the 29 above, rather than accepting either from a phone call or a hoarding.
- The promoter's other registrations. Search the promoter's name on up-rera.in and see what else is registered against it; a promoter with one project on record and a promoter with a dozen are different things to check, not different things to assume.
- What is on the price sheet, and what is gated. Ask for the current, dated price sheet in writing, and note which figures it prints openly and which ones (PLC, parking, club, IFMS, lease rent, GST) sit behind a further conversation. A sheet that will not date itself is a sheet to be careful with.
- The possession clock as printed. Note the proposed start date, the proposed period in months and the declared completion date, read all three as filed fields, and check the possession clause in the proforma agreement for sale rather than a verbal date.
- The exit path. Ask, in writing, how the project's documents describe the move from an allotment letter to a registered agreement for sale, and what its stated assignment or transfer rules are, before you rely on being able to sell an allotment on rather than a completed flat.
Those five checks run the same way on any one of the 29 names above, on Eldeco 7 Peaks, or on a project this page does not mention at all. That is the point of a checklist over a ranking: it travels to whichever name you are actually looking at.
How to verify a project on up-rera.in
In four steps, on the authority's own site, without a login:
- Open up-rera.in and go to the Registered Projects search.
- Search the project by name, or paste its registration number directly if you already have it (every one of the 29 above carries one, in the table).
- On the project summary, read the promoter's name, the registration date, the proposed start date and period, and the declared date of completion, the same fields this page prints for all 29 projects.
- Check the documents tab for the project's filed record, and treat the authority's own copy, not this page or any other, as the version that prevails if the two ever differ.
The Uttar Pradesh Real Estate Regulatory Authority is the body that runs this register, and the 29 rows in the table above and the Eldeco 7 Peaks register fields beside them were read from a mirror of that register on 29 July 2026. Checking any one row above on up-rera.in will tell you whether that reading still matches today. If it does not, the authority's own site is right and this page is the one that is behind.
Greater Noida mein naya project check karne ka tareeka
Simple hai: pehle project ka naam ya uska UP-RERA registration number up-rera.in par search karein, phir teen cheezein padhein, promoter ka naam, registration date, aur declared completion date. Yeh teeno fields register par hoti hain; is page ki table mein bhi 29 projects ke liye yahi teen fields di gayi hain. "Pre-launch" ya "best project" jaise shabd register par nahi milte, woh sirf sales ki baat hai; register sirf yeh batata hai ki project kab register hua aur kab complete hone ka declare kiya gaya hai. Price sheet, payment plan aur exit ke rules ke baare mein hamesha likhit mein poochein, kisi bhi promoter ya desk se, aur kabhi bhi 10% se zyada agreement for sale se pehle na dein (RERA Act 2016, Section 13).
Compiled by Vidit Kaushik, UP-RERA registered agent UPRERAAGT000309/01/2026, from a read of the UP-RERA register mirror dated 29 July 2026, published 10 September 2026. Questions about any row in the table, or about Eldeco 7 Peaks specifically, go to +91 98114 05300, pre-launch projects in Greater Noida 2026.
Related on this site: Eldeco projects in Greater Noida, Flats with open views in Greater Noida, VRV air-conditioned apartments, Investing in a Greater Noida flat, 2026, Eldeco 7 Peaks price, floor plans, towers.
Questions people ask about new projects in Greater Noida
How many new projects has Greater Noida registered since 2024?
Twenty-nine project registrations carry a Greater Noida register address and a registration date between 2024 and 2026, in the copy of the UP-RERA register mirror this desk read on 29 July 2026. Each one is listed with its promoter, sector, registration date and declared completion date on this page's table, sorted by sector.
Is Eldeco 7 Peaks Residences one of the 29 projects on this list?
No, not as a row in this particular cohort extract, even though it is a Greater Noida registration from the same era. Eldeco 7 Peaks Residences is registered under UPRERAPRJ106523/01/2026, dated 28 January 2026, at Sector Omicron 1A, with declared completion 14 November 2030; its filed register address reads 'Sector Omicron 1A' without the words 'Greater Noida,' and every address in this 29-project cohort carries those two words, which is the plain reason it is not a row here. The cohort does carry one other Eldeco project, Eldeco La Vida Bella, registered 26 April 2024 at Sector 12 under a separate promoter entity, Eldeco Real Estate Limited.
What does 'pre-launch' mean for a Greater Noida project?
Nothing on the UP-RERA register itself; 'pre-launch' is not a field the authority records. The register carries a registration date, a proposed construction period and a declared completion date for every project, including all 29 in this cohort, but nothing that marks whether a price list or a sales office has opened yet. Treat 'pre-launch' as a sales-floor word, and ask for a dated price sheet in writing instead of relying on it.
Which Greater Noida sector has the most new registrations in this cohort?
Sector 12, with four: Ashtech Presidential Towers, Eldeco La Vida Bella, ACE HANEI and VVIP Addresses Greater Noida (West). Three sector groups follow with three registrations each: the Delta-2 pocket (Delta Square, Lifestyle Central and MIGSUN Delta Street), the Delta-1 pocket (Delta Square 1, Kaveri City Centre-2 and Levante Metro Walk), and Sector PI-1 (JP Parks, PI City Center and Shagun City Center). Sector 10 carries two (Irish Platinum and Nirala Diadem), and the other fourteen sector or block labels in the cohort carry one project each.
How do I verify any Greater Noida project's registration on up-rera.in?
Open up-rera.in, go to the Registered Projects search, and search the project by name or by its registration number. Read the promoter's name, the registration date, the proposed start date and period, and the declared date of completion on the project summary, the same fields this page prints for all 29 projects in its table, and check the documents tab for the project's filed record. The authority's own copy always prevails if it ever differs from this page.
Greater Noida mein naya project kaise check karein?
Up-rera.in par project ka naam ya registration number search karein, phir teen fields padhein: promoter ka naam, registration date, aur declared completion date. Yeh teeno fields register par har project ke liye hoti hain, is page ki table mein bhi 29 projects ke liye same teen fields di gayi hain. 'Pre-launch' ya 'best project' jaise shabd register ka field nahi hai, sirf sales floor ki baat hai. Price sheet aur payment plan ke baare mein hamesha likhit mein poochein, aur agreement for sale se pehle 10% se zyada kabhi na dein (RERA Act 2016, Section 13).